  TRANSFORMERS  

1.     Feralloys Machadodorp Plant (Engineers - Bateman Titaco)
Supply, transport to site and installation of 4 x 18 MVA, 33 / 0,23-0,43 kV single-phase furnace transfomers.             

2.     Zimasco (Zimbabwe) (Engineers - Bateman Titaco)
Supply, transport to site and installation of 4 x 10 MVA, 33 / 11 / 0,2-0,376 kV single-phase furnace transformers.

3.     Anglo Platinum - Waterval Slag Cleaning furnace
Supply, transport to site and installation of 4 x 10 MVA, 6,6 / 0,14-0,36 kV single-phase furnace transformers.

4.     Anglo Platinum – Polokwane Smelter
Supply, transport to site, erection and commissioning of 4 x 56 MVA, 33 / 0,29-0,8 kV single-phase furnace transformers.

5.     Saldanha Steel
Supply, transport to site and installation of 1 x 138 MVA, 33 / 0,59-1,039 kV three-phase furnace transformer.

6.     Sentrachem - Newcastle
Supply, transport to site and installation of 1 x 38 MVA, 132 / 0,086-0,3 kV three-phase furnace transformer.

7.     Assmang – Machadodorp
Supply, transport to site and installation of 2 x 33 MVA, 33 / 0,12-0,37 kV three-phase furnace transformer.

8.     Scaw Metals
Supply, transport to site and installation of 2 x 7,9 MVA, 6,6 / 0.11-0.275 kV three-phase furnace transformer.

9.     Ferrometals – Witbank (Engineers – Bateman Titaco)
Supply, transport and delivery to site 1 x 12,5 MVA, 33 / 6,6 kV three-phase power transformer.

10.   Marqott Power Projects
Supply and delivery to site 1 x 10 MVA, 60 / 15 kV and 1 x 5 MVA, 15 / 6 kV three-phase power transformers.

11.   Tubatse Ferrochrome
Supply, transport to site and installation 1 x 12,33 MVA, 33 / 0,4-0,2 kV three-phase furnace transformer.

12.   ISCOR – Vereeniging
Supply, transport to site, installation and commissioning 1 x 75 / 84 MVA, 33 / 0,9-0,509 kV single-phase furnace transformer.

13.   Xstrata – Lion Project
Supply, transport to site, installation and commissioning 7 x 21 MVA, 33 / 0,462-0,230 kV single-phase furnace transformers.

14.   Davsteel
Supply, transport to site, installation and commissioning 1 x 65 / 78 MVA, 33 / 0,9-0,46 kV three -phase furnace transformer.

15.  Tata Ferrochrome Under manufacture - 7 x 12,67 MVA, 33/0,37-0,19 kV

16.  Techint for Assmang Cato Ridge Under manufacture - 3 x 12 MVA, 33/0,28- 0,1 kV

17.  Zimasco, Zimbabwe Under manufacture - 3 x 10 MVA, 33/0,189-0,376 kV

 

 

  CONSULTING DESIGN AND PROJECT MANAGEMENT  

  MINING  

18.   Blyvooruitzicht gold mine
Project management : 1 x 5,5 MVAr, 22 kV power factor correction bank; 1 x 3,5 MVAr, 22 kV power factor correction bank; 2 x 2 MVAr, 6,6 kV power factor correction banks; 2 x 3,5 MVAr, 6,6 kV power factor correction banks.

19.   Doornfontein gold mine
Tariff impact study and electrical system study, PFC design, specification and project management : 2 x 5 MVAr, 5th harmonic filter banks; 2 x 3 MVAr, 5th harmonic filter banks; 1 x 3 MVAr, power factor correction bank.

 

Doornfontein 6,6 kV harmonic filters

20.   Forzando Mine (AVMIN)
Feasibility study in respect of power factor correction/harmonic filtering requirements.

21.   Beeshoek Mine (AVMIN)
Electrical system study in respect of the effectiveness of existing PFC, design and specification of additional PFC requirements, project management : upgrading of an existing 22 kV 2,2 MVAr capacitor bank to 4,8 MVAr 5th harmonic filter.

22.   Blackrock Mine (AVMIN)
Electrical system study in respect of the effectiveness of existing PFC, design and specification of additional PFC requirements, project management : upgrading of the existing 22 kV capacitor bank installation.

23.   Afrikaner Lease Gold Mine
Electrical system study, 6,6 kV PFC design and specification.

24.   Kinross Gold Mine
Electrical system study in respect of the effectiveness of existing PFC/harmonic filter installation consisting of six 6,6 kV harmonic filter banks, together with recommendations to improve and optimise this PFC installation.

25.   Thabazimbi Iron Ore (Buffelshoek)
Electrical system study in respect of 22 kV PFC requirements and PFC design/specification.

26.   Thabazimbi Iron Ore
Investigation into problems experienced with failure and mal-operation of LV reactive power compensation on P&H 2300 shovels, together with recommendations in respect of remedial measures to improve the shovel supply voltage regulation.

27.   Nkomati Mine (AVMIN)
Electrical system study, PFC design and specification, project management : one 22 kV 1,8 MVAr capacitor bank, upgradeable to 5,4 MVAr 5th harmonic filter.

28.   Bikita Zimbabwe
Project management : one 6,6 kV 900 kVAr pole mounted capacitor bank.

29.   Buffelsfontein Gold Mine
Electrical system study, 6,6 kV PFC design and specification.

30.   East Rand Gold and Uranium Company (Ergo)
Nightsave tariff impact study. Electrical system study, 11 kV PFC design and specification, project management : 2 x 2,2 MVAr capacitor banks; 3 x 2,2 MVAr capacitor banks; 1 x 3,6 MVAr capacitor bank; 1 x 2,7 MVAr 5th harmonic filter bank; 1 x 7,2 MVAr 5th harmonic filter bank.

31.   St Helena Gold Mine
Nightsave tariff impact study. Electrical system study, 6,6 kV PFC design and specification.

32.   J.R. Mines
Electrical system study, 6,6 kV PFC design and specification.

33.   Arnot Colliery
Megaflex tariff impact study. Electrical system study to determine the effectiveness of existing 6,6 kV PFC together recommendations in respect of measures to optimise the PFC installations.

34.   Assmang - Beeshoek Mine
Megaflex tariff impact study and evaluation of the effectiveness of existing 22 kV PFC. Recommendations in respect of PFC optimisation, tariffs and associated savings, together with the potential increase in savings resulting from load shifting.

35.   Assmang - Blackrock Mine
Megaflex tariff impact study and evaluation of the effectiveness of existing 22 kV PFC. Recommendations in respect of tariffs and associated savings, PFC optimisation and savings resulting from potential load shifting, together with increased savings following planned load growth.

36.   Anglo Platinum - Union Section
Megaflex tariff impact study and evaluation of the effectiveness of existing 11 kV PFC. Recommendations in respect of tariffs and associated savings.

37.   Anglo Operations - Black Mountain No.2 Shaft
Greenfield study : Determination of the predicted shaft load demand and power factor during typical mining operations. Design and specification of required 6,6 kV PFC/harmonic filters to correct for the Shaft load and to provide harmonic filtration for the Rock and Man Winders.

38.   Phalabora Mining Company
Design of remedial measures for, and improvements to, the PMC Substation reticulation network, in order to ensure the network has sufficient capacity to provide an adequate electrical supply for the future load requirements, for both normal and contingency system operation.

39.   Anglo American Corporation - Konkola Copper Mines (Zambia)
Power factor correction scheme study and equipment technical specification for the Konkola, Nchanga and Nampundwe Copper Mines.

40.   Anglo American Corporation - Smelter Company (Zambia)
Power factor correction scheme study and equipment technical specification.

41.   Anglo American Corporation - Konkola Copper Mines (Zambia)
Detailed and comprehensive protection coordination study of the complete electrical networks at Nchanga, Konkola and Nampundwe mines and Smelter Co.

42.   Tati Nickel Mine (Botswana)
Comprehensive electrical system study for the overall new project, including load flow and fault level studies, 11 kV and 3,3 kV motor starting studies, design check of power factor correction already specified.

43.   Driefontein Mine - Goldfields of SA
System evaluation of the effectiveness of existing 6,6 kV PFC at the East 2#, West 5# and West 6#. Recommendations in respect of PFC optimisation and associated tariff savings, implementation of the proposed recommendations.

44.   Driefontein Mine West Gold Plant - Goldfields of SA
System evaluation of the capability of the Eskom 6,6 kV supply arrangement for planned load growth together with the effectiveness of existing 6,6 kV PFC. Recommendations in respect of PFC optimisation, implementation of the proposed recommendations.

45.   Assmang - Beeshoek Mine
Installation of radio linked energy management system.

46.   President Steyn No.3 Shaft
Design and specification of 6,6 kV PFC and harmonic filter installation. Project management : 3 MVAr 5th harmonic filter bank; 2 MVAr capacitor bank.

47.   BCL Mine (Botswana)
Comprehensive system study of the capability of the existing 220/66/11 kV supply arrangement to provide an adequate capacity for existing and future 2006 mine loading. Recommendations in respect of remedial measures for, and improvements to, the BCL 220/66/11 kV supply reticulation network, in order to ensure the network has sufficient capacity to provide an adequate electrical supply for the future load requirements, for both normal and contingency system operation. Design and specification of 2 x 12MVAr, 1 x 6MVAr and 1 x 65MVAr 5th harmonic filters.

48.   Mimosa Mine (Zimbabwe) – Phase III expansionComplete underground reticulation for the new Phase III expansion, including initial feasibility design and costing for budget purposes, detailed design, specification and full project management. Project included nine 11 kV/550V skid mounted substations, surface compressor house and fans, electrical supply to main conveyor and primary crusher.Project completion – 3rd quarter 2002

49.   Driefontein Mine – No.1 Shaft EastComprehensive system study of the capability of the existing 6,6 kV supply arrangement to provide an adequate capacity for existing and future mine loading.  Recommendations in respect of remedial measures for, and improvements to, the 6,6 kV supply, in order to ensure the network has sufficient capacity to provide an adequate electrical supply for the future load requirements. Comprehensive fault level and Protection Coordination study in order to verify switchgear, cable ratings and protection grading.  Recommendations in respect of improvements to the 6,6 kV supply arrangement.

50.   Western Platinum – Karee Mine Measurement survey of the existing steady state and transient conditions at the 33 kV supply.

51.   Harmony Gold Mine System evaluation of the effectiveness of existing 6,6 kV PFC. Recommendations in respect of PFC optimisation and project price for implementation of the proposed recommendations.

52.   Driefontein Mine – No.5 Shaft East Comprehensive fault level study in order to verify switchgear and cable ratings. Recommendations in respect of improvements to the 6,6 kV supply arrangement.

53.   Harmony Gold Mine Project management – Optimisation of existing PFC banks as recommended in our previous study.

54.   Anglo Platinum – Modikwa Mine Design, specification, and project management of 33 kV PFC and harmonic filter installation: 6 + 12 MVAr 5th harmonic filter banks.

55.   Anglo Platinum – Waterval Smelter Comprehensive fault level study in order to verify switchgear and cable ratings. Recommendations in respect of improvements to the 6,6 kV supply arrangement.

56.   Amandelbult Mine Load flow analysis of the existing steady state and transient conditions of the electrical network and provide recommendations for additional predetermined loadings.

57.   Kloof Mine - 7 Shaft Comprehensive fault level and protection device coordination study in order to verify switchgear and cable ratings. Provide protection settings giving optimum grading.

58.   Harmony - Doornkop Shaft Comprehensive system study of the capability of the existing 6,6 kV supply arrangement to provide an adequate capacity for existing and future mine loading. Recommendations in respect of remedial measures for, and improvements to, the 6,6 kV supply, in order to ensure the network has sufficient capacity to provide an adequate electrical supply for the future load requirements. Comprehensive fault level and protection coordination study in order to verify switchgear, cable ratings and protection grading. Recommendations in respect of improvements to the 6,6 kV supply arrangement.

59.   ARM Gold Mine System evaluation of the effectiveness of existing 6,6 kV PFC. Recommendations in respect of PFC optimisation and project price for implementation of the proposed recommendations.

60.   Harmony Gold Mine – JoelPFC optimisation study and implementation of our recommendations.

61.   Kumba Resources – Thabazimbi System study, design and specification of 22 kV harmonic filter installation.

62.   Northam Platinum Comprehensive system study and audit of the existing PFC design, in order to determine load patterns and power factor and to reconfigure the PFC to suit the Megaflex tariff.

63.   Kloof 5 Comprehensive fault level and protection device coordination study in order to verify switchgear and cable ratings. Provide protection settings giving optimum grading.

64.   Driefontein 5 W PFC optimisation study and implementation of our recommendations.

65.   Driefontein 2 E Comprehensive fault level and protection device coordination study in order to verify switchgear and cable ratings. Provide protection settings giving optimum grading.

66.   Avmin – Beeshoek Mine PFC optimisation study and implementation of our recommendations. Comprehensive fault level and protection device coordination study.

67.   Avmin – Beeshoek Mine PFC optimisation study and implementation of our recommendations. Comprehensive fault level and protection device coordination study.

68.   Harmony Gold Mine Comprehensive audit and recommendations of various PFC banks in the Harmony group.

69.   Amandelbult Mine Compilation of complete MV electrical network into electronic format, to facilitate future system planning and studies.

70.   Avmin – Beeshoek Mine Appointed as client’s consultant to carry out necessary QA/QC of substation project.

71.   Tati Nickel – Botswana Comprehensive electrical system study including, database compilation, PFC, load flow and fault level studies, of the 11KV network.

72.   EHL – Western Limb Tailings Design, specification, and project management of 6.6kV harmonic filter installation: 2 x 5 MVAr 5th harmonic filter banks.

73.   Anglo Platinum – Polokwane smelter Inspection and report of the installed furnace transformers.

74.   EHL – Boschfontein W. Mine Design, specification and project management of 11 kV PFC and harmonic filter installation.

75.   Assmang – Beeshoek Mine Design, specification and project management of 22/11 KV PFC at South Mine.

76.   Assmang – Black Rock Mine Comprehensive load flow, power factor correction, fault level and protection coordination studies on the 22 kV and 11 kV networks.

77.   Driefontein 8 Comprehensive fault level and protection device coordination study.

78.   Harmony Masimong 5  Fault level and protection device coordination study.

79.   Driefontein 1  On site measurements, PFC optimisation study and reconfiguration of existing PFC to our recommendations. 

80.   DRD Blyvooruitzicht and Doornfontein On site measurements and PFC optimisation study.

81.   Anglo Platinum Amandelbult Database, fault level (including equipment rating verification) and protection device coordination study of entire mine.

82.   Harmony Gold Mining PFC audit on various mines.

83.   Goldfields Beatrix 3 and 4 On site measurements and PFC optimisation study including design of new PFC.

84.   Harmony Phakisa Investigation into harmonic problems associated with existing PFC and design of new PFC. Problems resolved at no capital cost.

85.   Harmony Evander 2 and 7  On site measurements and PFC optimisation study.

86.   Goldfields Driefontein 1 Load flow study, protection device coordination study and motor protection settings.

87.   Harmony Lorraine Protection device coordination study.

88.   Anglo Platinum Frank Concentrator Earthing study.

89.   Goldfields Kloof Main On site measurements, QOS study and investigation into motor failure.

90.   Anglo Platinum Union Database, fault level (including equipment rating verification) and protection device coordination study of entire mine.

91.   Goldfields Driefontein North Shaft Fault level and protection device coordination study.

92.   Xstrata Coal South Witbank Colliery PFC optimisation study.

93.   Xstrata Coal Tavistock Colliery PFC optimisation study.

94.   Elandsrand Gold Mine Investigation into tripping of winders/ QOS study.

95.   Doornkop Gold Mine Volt drop study.

96.   Xstrata Coal Atcom Colliery PFC optimisation study.

97.   Elandsrand Gold Mine Volt drop study.

98.   Xstrata Coal Boschmans Colliery PFC optimisation study.

99.   Xstrata Coal Witcons Plant PFC optimisation study.

100.Xstrata Coal Waterpan Colliery PFC optimisation study.

101.Konkola Copper Mine  Comprehensive on site measurements, load flow study, fault level study, PFC/harmonic study, design and specification of 11kV PFC/harmonic filtering requirements.

102.Mopani Copper Mine Comprehensive on site measurements, load flow study, fault level study, PFC/harmonic study, design and specification of 11kV PFC/harmonic filtering requirements

 

  INDUSTRY  

103.Eikenhof pump station (Rand Water) Megaflex tariff impact study. Electrical system study, PFC design, specification and project management : 1 x 11 kV 5 MVAr 5th harmonic filter; 4 x 11 kV 890 kVAr unit capacitor banks; 4 x 11 kV 710 kVAr unit capacitor banks.

104.Zwartkopjes pump station (Rand Water) Megaflex tariff impact study. Electrical system study, PFC design, specification and project management : 15 x 6,6 kV 260 kVAr unit capacitor banks; 4 x 6,6 kV 470 kVAr unit capacitor banks; 2 x 6,6 kV 350 kVAr unit capacitor banks.

105.Houtkop pump station (Rand Water) Megaflex tariff impact study. Electrical system study, PFC design, specification and project management : 7 x 2,2 kV and 3,3 kV unit capacitor banks.

106.Bandag Alrode Project management : 1 x 6,6 kV 1,8 MVAr 5th harmonic filter bank.

107.SAB Pietersburg Project management : 1 x 11 kV 1 MVAr power factor correction bank.

108.Transwerk Koedoespoort Project management and equipment supply : revamp of two 11 kV blocking reactor bays, including supply and installation of 3 x 3,98 mH, 800 A blocking reactors, CTs and PILC terminations.

109.Lorne Stewart (UK) Acceptance testing of dealing room on behalf of Lorne Stewart, including fire control system, security system, UPS and generator, air conditioning system and electrical services.

110.Daleside substation (Rand Water) Evaluation of feasibility of proposed 88/11 kV 20 MVA substation for Daleside pump station.

111.Vereeniging pump station (Rand Water) Investigation to determine possible causes for spurious tripping of slip ring recovery variable speed drive harmonic filters.

112.Zuikerbosch pump station (Rand Water) Megaflex tariff impact study. Electrical system study, PFC design, specification and project management : 70 x 6,6 / 11 kV unit capacitor banks; 6 x 11 kV 2 MVAr damped 5th harmonic filters.

113.Palmiet pump station (Rand Water) Megaflex tariff impact study. Electrical system study, PFC design, specification and project management : 32 x 11 kV unit capacitor banks; 2 x 11 kV 2 MVAr damped 5th harmonic filters.

114.Lethabo pump station (Rand Water) Electrical system study in respect of additional 11 kV PFC / harmonic filtering requirements, together with recommendations to optimise the existing installation.

115.Libanon pump station (Rand Water) Megaflex tariff impact study. Electrical system study, PFC design and specification.

116.Bloemendal pump station (Rand Water)  Megaflex tariff impact study. Electrical system study, PFC design and specification.

117.Feralloys Machadodorp Plant Electrical system study in respect of the Plant 33 kV PFC requirements, following the planned upgrade of Furnace 2, 3 and 5 from 24 MVA to 30 MVA.

118.Feralloys Cato Ridge Plant Electrical system study in respect of the effectiveness of existing 33 kV power factor correction and harmonic filtering, together with the feasibility of converting the Furnace 1 and 2 supply to the Megaflex tariff.

119.Daleside substation (Rand Water) Design and specification for the complete 88/11 kV substation.

120.BMW (SA) Rosslyn Electrical system study, PFC design and specification, project management : 1 x 11kV 2,2 MVAr 5th harmonic filter and 1 x 11 kV 2,1 MVAr capacitor bank.

121.Feralloys Machadodorp Plant
Electrical system study and project management in respect of 33 kV power factor correction and harmonic filtering requirements for the overall Plant, following installation of the new 54 MVA Furnace 1, Sintering and Smelting plant loads.

 

Machadodorp 33 kV filters

122.Vametco Minerals
Nightsave kVA demand and Megaflex tariff impact studies, together with an electrical system study to evaluate the PFC requirements for each tariff option. Recommendations in respect of tariff and PFC.

123.Polifin Midland Plant (Sasolburg) Evaluation of the existing 33 kV supply harmonic conditions and effectiveness of existing PFC/harmonic filters. Recommendations in respect of the rectifier transformer phase shift required for the new 12 MVA rectiformer in order to limit the harmonic impact of the new load. Determination of the predicted plant load and power factor, harmonic conditions and filter loading following installation of the new rectiformer.

124.SA CHROME Comprehensive electrical system study for the overall new project, including load flow and fault level studies, harmonic filter design and specification.

125.Zimasco (Zimbabwe) Electrical system study in respect of the Plant 11 kV PFC requirements following the planned furnace upgrades, and implications in respect of harmonic conditions and loading of existing harmonic filters.

126.Lafarge Cement (Lightenburg) Electrical system study in respect of the Plant 11 kV and 3,3 kV PFC requirements on the Megaflex tariff, design and specification of PFC/harmonic filters required. Project management; 3MVAr and 2MVAr 6,6 kV 5th harmonic filters; 2MVAr and 3,5MVAr 3,3 kV 5th harmonic filters.

127.Anglo Platinum – Frank Concentrator Determination of the existing plant 6,6 kV load demand and power factor during typical operation. Fault level study and protection coordination on the substation incomers and main feeders.

128.Samancor – Ferrochrome Quality Of Supply, earth resistance test and comprehensive electrical system study in respect of 33 kV system supply capacity requirements for the overall Plant, following the planned phased upgrade and installation of a new sub-plant.

129.August Lapple Electrical system study in respect of 11 kV PFC / harmonic filtering requirements and project management.

130.SA Chrome Fault finding on furnace current electrode measuring system.

131.Ferrometals Plant – Witbank Comprehensive electrical system study in respect of 33 kV system supply capacity and power factor correction/harmonic filtering requirements for the overall Plant, following the planned phased upgrade of the existing 48MVA Furnace 4 and Furnace 5 to 63MVA.

132.Anglo Platinum –  ACP and Oxygen PlantGreenfield study : Determination of the predicted plant load demand and power factor during typical operation. Design, specification and project management of required 6,6 kV PFC/harmonic filters to correct for the plant load and to provide the required harmonic control

133.SA Chrome Investigation into catastrophic failure of PFC filter bank. Recommendations and repair of bank, including fitting of ‘bird’ protection.

134.Zwartkopjes Pump Station (Rand Water) System study, PFC design, specification supply and project management : 15 x 11 kV unit capacitor banks

135.Botswana Metal Refinery - Tati Activox Project System study, PFC/harmonic filter design and specification of 3 x 11kV 4,5MVAr second order damped 5th harmonic filters and 3 x 11kV 3,5MVAr 7th harmonic filters. Project subsequently postponed.

136.Transnet PE Manganese Load flow study.

 

  CITY COUNCILS & MUNICIPALITIES  

137.Randfontein TLC
Megaflex tariff impact study. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings.

138.Brakpan TLC Standardrate tariff impact study. Electrical system study, PFC design and specification, project management : 1 x 33 kV 9 MVAr 5th harmonic filter.

 

Brakpan 33 kV harmonic filter

139.Piet Retief Municipality Tariff impact and PFC feasibility study.

140.Midrand Metropolitan Town Council Megaflex tariff impact study. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings. Electrical system study to evaluate the effectiveness of existing 11 kV and 6,6 kV PFC installed, together with recommendations in respect of PFC optimisation.

141.Local Council of Krugersdorp Megaflex tariff impact study. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings. Electrical system study to evaluate the effectiveness of existing 11 kV and 6,6 kV PFC installed, together with recommendations in respect of PFC optimisation.

142.Parys Town Council Electrical system study, PFC design and specification, project management : 1 x 11 kV 3 MVAr capacitor bank.

143.Pietersburg TLC Megaflex tariff impact study. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings. Electrical system study to evaluate the effectiveness of existing 11 kV PFC installed, together with recommendations in respect of PFC optimisation.

144.Kriel TLC Megaflex tariff impact study. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings.

145.Brakpan TLC Megaflex tariff impact study. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings.

146.Robertson TLC Megaflex tariff impact study. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings.

147.Volksrust Local Council Megaflex tariff impact study. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings.

148.Vryburg Town Council Megaflex tariff impact study. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings.

149.Delmas TLC Megaflex tariff impact study. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings.

150.Utrecht TLC Megaflex tariff impact study. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings.

151.Glencoe TLC Megaflex tariff impact study. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings.

152.Groblersdal TLC Megaflex tariff impact study. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings.

153.City Power Comprehensive study, design and recommendation specification of 88 kV PFC and harmonic filter installation: 150 MVAr harmonic filter banks.

154.Lephalale Municipality Tariff conversion impact study, including power factor correction analysis. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings.  Nelspruit Town Council Maintenance and repairs to the existing 33 kV Filter banks.

155.Lephalale Municipality Tariff conversion impact study, including power factor correction analysis. Presentation of findings to Council. Implementation of tariff conversion and assessment of actual savings.

 